Project description:
Mica paper is used for insulation in high-voltage machinery.
After the specifications were determined, the project was realized together with the client. The coordination of the interfaces between the various vendors and the client was followed by the planning of the hardware with emphasis placed on safety relevant aspects.
Next, software was written and the control cabinets were constructed under the watchful eye of the assembly supervision. After the initial start-up, it was time to optimize the plant operation and establish the connection to the client’s recipe control system.
Tasks:
Project management
Coordination of plant vendors
Interface coordination (Plant Suppliers - Customer - Automation)
Hardware engeneering includes emergency system
Specifying and ordering hardware components
Build control cabinet
Visualisation MP370 / Cimplicity
Creation of a process description for machine and material
Software including recipe management
Start-up